Master Link Assembly

,

Master Link Assembly

Master Link Assembly is perfect for offshore use. The coating of the Master Link Assembly ensures long-term durability, even under severe environmental conditions. High tensile forged alloy steel. Quenched and tempered.

  • CapacityUp to 50 tonnes